NavyDEP
 

Go Back   NavyDEP > Ratings (Jobs) > Ratings (Jobs) ~ Seaman > Advanced Electronics Computer Field

Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-23-2013, 11:18 AM   #15
Little Red
 
Join Date: Jun 2013
Location: San Diego, CA
Posts: 1
Rep Power: 0
Little Red is on a distinguished road
Default

That's so strange how a schools lengths can change so drastically in such a short time. When I swore in April 11 of this year they gave me a few job cards, one for AECF and then I asked for more detailed on each rating so the classifier gave me one of ET and FC. The job card for AECF was revised in 2008 said a school for FC was 12 weeks, and ET was 17 weeks. But on the individual ones which was revised in oct of 2012, says ET a school is 42 weeks, and FC a school is 20 weeks. I mean for an ET a time frame change like that can be very surprising lol
Little Red is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 04:59 AM.


Powered by vBulletin® Version 3.8.8 Beta 3
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.6.0 (Pro) - vBulletin Mods & Addons Copyright © 2026 DragonByte Technologies Ltd.
This site and contents ©2009-2014 NavyFamiles