![]() |
|
|||||||
|
Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes
|
|
|
Thread Tools | Display Modes |
|
|
#5 |
|
Senior Member
![]() Join Date: Jan 2012
Location: San Diego, California
Posts: 322
Rep Power: 0 ![]() |
The field info sheet they gave me at MEPS for AECF (revised 01/08) says ATT is 9 weeks, FC Strand 12 weeks, and ET Strand 17 weeks.
The last one above (revised 06/11) says ATT is still 9 weeks, FC Strand is 20 weeks, and ET Strand is 42 weeks. Are these still accurate? Or has this changed again? I'm just trying to get an accurate picture of how long I will be in Great Lakes. |
|
|
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| HM Rating Info Sheet | mia | Hospital Corpsmen G000, L500 | 1 | 03-23-2013 09:49 PM |
| AW rating info sheet.... | Craig | AW = NAVAL AIRCREWMAN (AWO, AWF, AWV, AWS, AWR) | 1 | 04-28-2009 07:53 PM |
| FC Rating Info Sheet | mia | Fire Controlman B310, B311 | 0 | 01-26-2009 03:19 PM |
| CE rating info sheet... | Craig | CE = CONSTRUCTION ELECTRICIAN | 0 | 01-21-2009 02:36 AM |
| AZ Info sheet | Craig | AZ = AVIATION MAINTENANCE ADMINISTRATIONMAN | 0 | 01-20-2009 07:17 PM |