NavyDEP
 

Go Back   NavyDEP > Ratings (Jobs) > Ratings (Jobs) ~ Seaman > Advanced Electronics Computer Field

Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-16-2012, 12:54 PM   #5
Laworlo
Senior Member
 
Join Date: Jan 2012
Location: San Diego, California
Posts: 322
Rep Power: 0
Laworlo is on a distinguished road
Default

The field info sheet they gave me at MEPS for AECF (revised 01/08) says ATT is 9 weeks, FC Strand 12 weeks, and ET Strand 17 weeks.

The last one above (revised 06/11) says ATT is still 9 weeks, FC Strand is 20 weeks, and ET Strand is 42 weeks.

Are these still accurate? Or has this changed again? I'm just trying to get an accurate picture of how long I will be in Great Lakes.
Laworlo is offline  
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
HM Rating Info Sheet mia Hospital Corpsmen G000, L500 1 03-23-2013 09:49 PM
AW rating info sheet.... Craig AW = NAVAL AIRCREWMAN (AWO, AWF, AWV, AWS, AWR) 1 04-28-2009 07:53 PM
FC Rating Info Sheet mia Fire Controlman B310, B311 0 01-26-2009 03:19 PM
CE rating info sheet... Craig CE = CONSTRUCTION ELECTRICIAN 0 01-21-2009 02:36 AM
AZ Info sheet Craig AZ = AVIATION MAINTENANCE ADMINISTRATIONMAN 0 01-20-2009 07:17 PM


All times are GMT -6. The time now is 07:31 AM.


Powered by vBulletin® Version 3.8.8 Beta 3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.6.0 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
This site and contents ©2009-2014 NavyFamiles