NavyDEP
 

Go Back   NavyDEP > Ratings (Jobs) > Nuclear Program (NUC) > NUKE = NUCLEAR POWER FIELD

Family Members join our new Facebook group sponsored by NavyDEP: https://www.facebook.com/groups/Rtcgreatlakes


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-08-2012, 12:40 AM   #9
prop827
Senior Member
 
Join Date: Oct 2011
Location: Boston, MA
Posts: 633
Rep Power: 0
prop827 is on a distinguished road
Default

We have a shortage of nukes in the fleet, we need them bad, so a contract is definitely doable, the problem is there is a major backlog of people who have graduated power school and are waiting to go to prototype. This is the cause of the far out ship dates, class up at prototype taking so long. I remember when I left it was about a 6 month delay to ship, no idea what it is now.
prop827 is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 07:32 PM.


Powered by vBulletin® Version 3.8.8 Beta 3
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.6.0 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
This site and contents ©2009-2014 NavyFamiles